Installation

Figure 4-3 Attachment point

4.3.1 Structural requirements

4.3.2 Energy required

4.3.3 Ambient conditions

2
®
Install the plant on a sturdy workbench and fix it at the four at-
tachment points using M 10 screws.
Adjust the working height to the operator's height.
Permanent floor load
Floor bearing capacity
Floor quality
Evenness
Gradient
Table 4-1 Floor conditions
Ensure that the following energy is available when the plant is delivered::
Voltage
400 V~ ±10%
50 – 60 Hz
Power
4.4 kW
Prefuses
3 x 16 A
Table 4-2 Electric supply
Ambient temperature
Air moisture
Table 4-3 Ambient conditions
4-1
2
approx. 0.07 kg/mm
2
min. 2,500 kg/m
B25
Waviness max. 5 mm/m
max. 5 mm/m
three phases, mid-point
conductor, protective con-
ductor (earth)
o
o
10
C - 40
C
45% - 65%