Commissioning

Description
When shipped from the factory the G120 inverter (control unit and power module) must
not be operated before a commissioning of the inverter has been performed.
This can be done via:
● downloading a valid parameter set from BOP or STARTER
● performing a commissioning via BOP or STARTER
For a successful operation of the inverter-motor combination, the following
prerequisites must be fulfilled:
● The rated inverter current is at least as great as the rated current of the motor.
● The power range of the inverter matches the power range of the motor.
Commissioning with the Getting Started Guide
Commissioning in the Getting Started Guide is described using STARTER via PC
Connection Kit. For other commissioning modes please refer to the Operating
Instructions of the Control Module.
The STARTER software uses a series of wizards and masks to guide the user through
the commissioning procedures for the inverter.
What do you need?
The following items are required to
commission the Inverter with STARTER:
● STARTER software is installed on
your PC
● The inverter is connected to the PC
via the PC connection cable - order
number: 6SL3255-0AA00-2AA0