Connection Procedure; Wiring Plan - Vega VEGAWELL 52 Operating Instructions Manual

Submersible pressure transmitter with ceramic measuring cell 4...20 ma
Hide thumbs Also See for VEGAWELL 52:
Table of Contents

Advertisement

5 Connecting to power supply
Direct connection
Connection via VEG-
ABOX 02 or VEGABOX 03
Direct connection
Connection via VEG-
ABOX 03
18
5.2

Connection procedure

Proceed as follows:
1. Wire the suspension cable up to the connection compartment
2. Connect the wire ends to the screw terminals according to the

wiring plan

Connect the VEGAWELL 52 according to the description in the oper-
ating instructions of the respective VEGABOX.
5.3
Wiring plan
Fig. 10: Wire assignment, suspension cable
1
Blue (-): to power supply or to the processing system
2
Brown (+): to power supply or to the processing system
3
Shielding
4
Breather capillaries with filter element
1
Fig. 11: Wiring plan VEGAWELL 52 for 4 ... 20 mA, 4 ... 20 mA/HART
1
To the sensor
2
To power supply or processing system
3
Shielding
3)
Wire number
1
2
The suspension cable is already preconfectioned. After shortening the sus-
2)
pension cable, fasten the type plate with support again to the cable.
Connect screen to ground terminal. Connect ground terminal on the outside
3)
of the housing to ground as prescribed. The two terminals are galvanically
connected.
Wire colour/Polarity
brown (+)
blue (-)
Shielding
VEGAWELL 52 • 4 ... 20 mA
2)
4
1
2
3
2
-
2
+
3
Terminal
1
2
Grounding

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents