Operating mode
The ISS 1Play manages the energy flows in the installation in line with the following principles:
Photovoltaic energy is used as a priority to supply loads and to charge the battery.
If the photovoltaic energy is insufficient to power loads, the battery provides the remainder.
If the state of charge (SOC) of the battery reaches a minimum value established by the user
(SOCmin), the diesel genset will be connected. If it is not operational, the ISS 1Play powers loads
until the battery is completely flat (SOCdescx).
Battery charging permitted
only from PV source
Battery charging permitted
from PV source and/or
diesel genset
Links
The instructions for configuration and commissioning, detailed
wiring diagram and further information about the operation
mode can be downloaded at the following link:
http://www.ingeconsuntraining.info/?page_id=10534
Technical Guide
DISCHARGING
Connection of the diesel
genset
End of supply
(system stoppage)
15/01/2018
INGECON SUN STORAGE 1Play
CHARGING
Disconnection of the diesel
genset
Supply restart