Installation Of 100Base-Tx; Troubleshooting - Compex SGX3224 Quick Install Manual

24 - port all 10/100 management switch
Table of Contents

Advertisement

Installation of 100Base-TX Optional Module
1.
Power off your Switch hub. Remove the power cord (as a safety
precaution).
2.
Unscrew and remove the Front Cover Plate.
3.
Insert and slide in the fiber module that you want to install until the
module is fully inserted and engaged to the back plane socket of the
switch.
4.
Replace the screws and the unit is ready for work.
5.
Connect the power cord and power ON. The unit is now ready to
operate.

Troubleshooting

LED Indicators:
The Compex 24-Port All 10/100 Switch (SGX3224, SGX3224 PLUS) is
designed with LED indicators to display various operating status such as:
Power ON/OFF, Port Activity Status (Transmit/and Receive), Duplex status
and 10/100 connection Status which are found on the Front panel. The LEDs
function as useful troubleshooting aids for the SGX3224
LED indicators
Description of Function
♦ ♦ POWER LED
Power LED (Green):
MAIN LED will LIGHT UP when the power supply is
(
)
POWER
ON. If Power LED does not light up, check that:
1. Plug/cord is properly inserted into the socket.
2. The ON/OFF switch is turned ON.
♦ ♦ ACT/Link
ACT LED (Green):
LEDs
BLINKS when network activity is present.
(
)
ACTIVITY
STEADY LIGHT indicates a good cable link.
When Act/Link LEDs do not light up, check that:
1.Wire pairs connection at RJ-45 plug are correct.
2. RJ-45 plug is fully inserted until you hear a click
sound.
3. The PC is powered-up.
8
Compex 24 - Port All 10/100 Management Switch
(SGX3224, SGX3224 PLUS)
English

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sgx3224 plus

Table of Contents