Input And Output Connection Requirements; Figure 6 Dual Source Input Supply-Input And Output Connections; Figure 7 Hardwire Terminals - Liebert GXT3-240TBATTCE User Manual

Table of Contents

Advertisement

Figure 6
Dual source input supply—input and output connections
UPS Input ~
BYP
L1
Figure 7
Hardwire terminals
Jumper
removed
for clarity
3.6.1

Input and Output Connection Requirements

• Any 120V loads must be distributed evenly between X1-X2, X1-X4 and X4-X2. Do not connect
loads between X3-X2 or between X3-X4—these are not standard voltages.
• The single-phase isolation output transformer is a separately derived source. The output Neutral
(X2) is bonded to Ground within the UPS cabinet. No other bonding wire is needed.
• Install a Grounding Electrode Terminal (GET) to the nearest grounding electrode in the building
grounding electrode system. If the grounding electrode conductor must be protected, non-metallic
conduit is recommended. If metal conduit must be used, bond both ends of the conduit to the
grounding electrode conductor. Conduit is not an acceptable grounding electrode conductor.
• The utility may be derived from a single-phase or three-phase source. The line-to-ground voltages
are dependent on the grounding of the utility and do not affect the output voltages. Do not use a
floating AC source.
• With dual input source configuration, both sources are tied together within the UPS cabinet. Two
additional ground screw terminals are supplied for use as needed.
More user manuals on
Bypass Input ~
L2
L1
UPS Feed
Bypass Feed
ManualsBase.com
L2
GET
X1
120
10
Installation
Output ~
X2
X3
X4
208
220
120
0
240

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gxt3-10000t220

Table of Contents