Handling & Unpacking - Neptronic SKE90 Installation Instructions Manual

Electric steam humidifier ske series ske-xl bacnet
Hide thumbs Also See for SKE90:
Table of Contents

Advertisement

Lifting or handling MUST only be carried out by trained and qualified personnel. Ensure
!
that the lifting operation has been properly planned, risk assessed and that all
equipment has been checked by a skilled and competent Health & Safety
representative and effective control measures put in place.
It is the customer's responsibility to ensure that operators are trained in handling heavy
goods and to enforce the relevant lifting regulations.
Refer to Dimensions & Weight section for system dry weights.
Handling and
The SKE-XL Steam Humidifier MUST always be handled and lifted with care and must
Lifting
remain in its original packaging for as long as possible prior to installation
The SKE-XL Steam Humidifier package may be carried using a forklift from the
underside. Caution must be exercised to ensure balanced load before lifting.
Lifting sling angle must be greater than 30˚ to the horizontal.
Unpacking
SKE-XL Steam Humidifier is shipped on a wooden crate.
Remove packing wooden crate and skids prior to installation.
List Of
 2 sets of keys.
Accessories
 2 adjustable steam hose collars per steam outlet.
Supplied
 The present Installation Instructions and User Manual.
 Wiring diagram affixed onto the interior of the electrical compartment door.
Standard enclosure
7
SKE-XL BACnet Steam Humidifier
Installation Instructions and User Manual
Handling & Unpacking

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ske110Ske120Ske100

Table of Contents