Water Drain
Specification
Water Drain
Installation
S K E -X L
Weather Proof
Enclosure
Water Drain Valve
Water Drain installation must conform to local codes and regulations.
Any installation work must be carried out by suitably qualified personnel.
Water Drain temperature: 60˚C
Model
SKE90
SKE100
SKE110
SKE120
Water drain outlet connection must be connected to drain pipe of sufficient size.
We recommend the use of Ø 20mm minimum standard copper hydraulic pipes.
Minimum water drain pipe gradient must be 6.5mm per 300mm horizontal run.
No drain trap is required.
1 2 0 m m
The weather proof enclosure is equipped with a normally open valve, enabling the
humidifier to drain all water during a power failure, in order to prevent water from
freezing within the unit. During normal operation, the humidifier reduces drain water
temperature to +60°C.
CAUTION: During a power failure, the drain water temperature is not reduced.
Installed drain piping must be rated to +100°C.
SKE-XL BACnet Steam Humidifier
Installation Instructions and User Manual
Stage 4 – Water Drain Connection
Water Drain Outlet
Connection size
Ø 20mm
Ø 2 0 m m
(Illus. 14)
14
Pan Drain Outlet
Connection size
Ø 15mm
Ø 3 8 m m
m in im u m