Stage 2 – Steam Distribution Installation
1.
Maximum steam velocity in a pipe must not exceed 12m/s velocity.
Velocities above this will generate noise.
2.
Minimum steam pipe gradient must be 125mm rise in 1m run.
3.
The lowest point of any steam hose or rigid pipe must be the humidifier.
A steam separator (S trap) must be installed higher than the static
pressure of the system by at least 50mm.
4.
Total length of the flexible steam hose must not exceed 5 m or insulated
rigid piping must not exceed 15 m.
5.
Whenever possible use rigid copper piping, flexible steam hose can be
used for short runs or for interconnecting between rigid pipe runs, ensure
that there is no kink in the flexible hose.
When using rigid copper pipe, insulation must be used to diminish
condensation build up.
Static pressure
+ 50 mm
Incorrect Installation
(Illus. 8)
6.
Connection pipe sizes between SKE-XL and steam distributor in the duct
must be 108mm up to 240kg/h
7.
All Humidifiers above 100kg/h capacity must use Multi-Steam.
10
SKE-XL BACnet Steam Humidifier
Installation Instructions and User Manual
Correct Installation
SKE-XL humidifier with 2 SAMB E2 manifolds
Min. 7°
(Illus. 7)
Static pressure
+ 50 mm

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ske110Ske120Ske100

Table of Contents