Handling & Unpacking - Neptronic SKG3 Series Installation Instructions Manual

Gas fired
Table of Contents

Advertisement

Lifting or handling MUST only be carried out by trained and qualified personnel.
!
Ensure that the lifting operation has been properly planned, risk assessed and that
all equipment has been checked by a skilled and competent Health & Safety
representative and effective control measures put in place.
It is the customer's responsibility to ensure that operators are trained in handling
heavy goods and to enforce the relevant lifting regulations.
Refer to Dimensions & Weight section for system dry weights.
Handling and
The SKG3 Steam Humidifier MUST always be handled and lifted with care and
should remain within its original packaging for as long as possible prior to installation
Lifting
The SKG3 Steam Humidifier package may be carried using a fork lift from the
underside. Caution should be exercised to ensure balanced load before lifting.
Lifting of SKG3 Steam Humidifier MUST always be carried out using the appropriate
Neptronic Lifting Bracket (sold separately).
Lifting sling angle should be greater than 30˚ to the horizontal.
(Fig. 4)
Unpacking
SKG3 Steam Humidifier is shipped on a wooden crate.
Ensure packing wooden crate and skid are removed prior to commissioning.
List of
2 sets of keys.
accessories
2 adjustable steam hose collars to connect on the steam output of the humidifier.
supplied
SKG3-110 to 405
SKG3-505 to 810
The Start up check list & Combustion field adjustment instructions.
The present Installation Instructions.
The Wiring diagram affixed onto the interior of the front access door.
The Service and trouble shooting guide.
The BACnet® communication module user guide (if humidifier is equipped with
BACnet® option).
Model
1 Flue pipe transition connector Ø5'' to Ø4''
6
SKG3 Steam Humidifier
Handling & Unpacking
(Fig. 5)
Flue gases outlet connector
1 Flue pipe connector Ø5''

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents