IX - Manual testing of circuits

While the status of a relay is displayed, it is possible to test it.
1/ Select the circuit you wish to test with the
If the circuit is a relay circuit:
1/ Start the test with the
- If you press it briefly (for less than 3 seconds), the
relay is activated (ON position) for as long as the key is pressed.
- If you press it for a longer period (more than 3 seconds), the relay is activated (ON
position), and if you press it again the relay is deactivated (OFF position).
If the circuit is a melody circuit :
1/ You can select the melody to be tested with
keys.
2/ Start the test with the
If you press it briefly (for less than 3 seconds) = the melody is played once.
If you press it for a longer period (more than 3
seconds) = the melody is played loop until you press
it again.
If the circuit is a Harmonys circuit :
1/ You can select the melody to be tested with
keys.
2/ Start the test with the
If you press it briefly (for less than 3 seconds) = the melody is played once.
If you press it for a longer period (more than 3
seconds) = the melody is played loop until you press
it again.
24
key.
key.
key.
key.
Circuit 12: START
Access control
Cir.12: START TEST ú
Access control
and
Cir.ô12: START MEL01
Access time
Cir.61ô: FORCED TEST01 ú
STOP TEST :
and
Cir.ô12: START MEL01
All melody sounders
Cir.61ô: FORCED TEST01 ú
STOP TEST :
ú
ok
ok
ú
ok
ok
ú
ok
ok

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents