Carrier 58MSA040-08 Installation, Start-Up, And Operating Instructions Manual page 46

4-way multipoise fixed-capacity condensing gas furnace

Advertisement

CH ECKL[ST--BNSTALLAT[ON
LOAD CALCULATION
Heating Load (Btuh)
Cooling Load (Btuh)
Furnace Model Selection
VENT PIPING
Termination
Location
Roof or Sidewall
Vent Pipe Length
Vent Pipe Elbow Quantity
Pipe Diameter Determined
from Sizing Table
Pipe Sloped To Furnace
Pipe Insulation
Over Ceitings
Low-Ambient
Exposed Pipes
Condensate
Drain
Unit Level or Pitched Forward
Internal Tubing Connections
Free of Kinks
and Traps
External Drain Connection
Leak Tight and
Sloped
Condensate Trap Primed before Start-Up
Heat Tape Installed if Required
CHECKLIST--START-UP
Gas Input Rate (Set Within 2 percent of
Rating Plate)
Temperature
Rise Adjusted
Thermostat
Anticipator
Anticipator Setting Adjusted or
Cycte Rate (3 Cyctes per Hr) Setected
Safety Controls
Check Operation
Primary Limit
Pressure Switch
4d