Installation of a complete new DECT6000 system

3.1 Tools

For installation of a DECT6000 system some tools are needed. An overview of necessary
and useful tools is given below:
• Set of normal and Pozidrive screwdrivers
• Drill with drill bit (6 mm) (for mounting DCU and Base Stations)
• Crimping tool for modular plug RJ11
• Soldering iron & solder
• Tweezers (curved)

3.2 Introduction

To set up a new DECT6000 system actions mentioned in this section have to be carried
out. When an existing system must be extended some of these actions may not be
necessary, e.g. position and mounting of the DCU.
The actions that have to be carried out to install a complete system are:
• Determine position and number of base stations (and repeaters) using the
DECT 6000 deployment kit
• Mounting base stations (and repeaters)
• Determine position of the DCU
• Hardware configuration of the DCU
• Mounting the DCU
• Installing the Alphadesk central control PC with the necessary software installed
(LBB 6511/00)
• Connect the DCU, base stations, Alphadesk PC and PABX to each other
• Cable delay measurement using Alphadesk LBB 6511/00 software
• Install a back-up power supply (optional)
• Configure the complete system by using the software LBB 6511/00
DECT6000
en
CHAPTER 3
Installation Instructions
3