en
CHAPTER 8
Figure 8.5 Telephone system integrated with DECT using a BS-DCU connection cable
8.3.3 Software configuration of the extension card
Installation Instructions
28
PABX
Caution
When a new system has been set up or when base stations are
added to an existing system it is necessary to carry out a cable delay
measurement. This has to be done by use of the software installed on
the Alphadesk central control PC, described in the "Instructions For Use"
of the LBB 6511/00.
BS
Terminal strip
Terminal strip
BS-DCU connection cable
ACU-PABX connection cable
DECT6000
BS
BS
BS
DCU