Software Configuration Of The Base Station; Installation Instructions; Dect6000 - Bosch DECT6000 Installation Instructions Manual

Table of Contents

Advertisement

2. Connect the optional BS-DCU connection cable LBB 6721/02 to the BS 0-7 or BS
8-15 connector of the DCU (see figure 7.7). The wires of the connection cable must
be connected via a terminal strip, located near by a PABX, to the base stations (see
figure 7.3). For wiring of the BS-DCU connection cable (see Table 7.2).
Pin
Signal
1
a
14
b
2
a
15
b
3
a
16
b
4
a
17
b
Table 7.2 Connections of the BS-DCU connection cable LBB 6721/02
1
Figure 7.7 Botttom view of the DCU
RS232 connector for connection with Alphadesk central control PC
Mains inlet, 110...230 Vac/50..60 Hz, 1.6A
Fuse, T3.15 Ah/250 Vac
On/Off switch

7.3.3 Software configuration of the base station

Caution
When a new system has been set up or when base stations are
added to an existing system it is necessary to carry out a cable delay
measurement. This has to be done by use of the software installed on
the Alphadesk central control PC, described in the "Instructions For Use"
of the LBB 6511/00.
Wire colour
BS
white/blue
0/8
blue/white
white/orange
1/9
orange/white
white/green
2/10
green/white
white/brown
3/11
brown/white

DECT6000

Pin
Signal
Wire colour
5
a
white/grey
18
b
grey/white
6
a
red/blue
19
b
blue/red
7
a
red/orange
20
b
orange/red
8
a
red/green
21
b
green/red
9...13
Not connected
22...25
Not connected
BS 8-15
BS 0-7
2
3
4

Installation Instructions

en
CHAPTER 7
BS
4/12
5/13
6/14
7/15
23

Advertisement

Table of Contents
loading

Table of Contents