GE G60 Instruction Manual page 405

Generator protection system
Hide thumbs Also See for G60:
Table of Contents

Advertisement

CHAPTER 5: SETTINGS
Operand type
Operand syntax
ELEMENT:
BKR 1 FLSHOVR PKP A
Breaker flashover
BKR 1 FLSHOVR PKP B
BKR 1 FLSHOVR PKP C
BKR 1 FLSHOVR PKP
BKR 1 FLSHOVR OP A
BKR 1 FLSHOVR OP B
BKR 1 FLSHOVR OP C
BKR 1 FLSHOVR OP
BKR 1 FLSHOVR DPO A
BKR 1 FLSHOVR DPO B
BKR 1 FLSHOVR DPO C
BKR 1 FLSHOVR DPO
BKR 2 FLSHOVR
ELEMENT:
BKR ARC 1 OP
Breaker arcing
BKR ARC 1 DPO
BKR ARC 1 MAX OP
BKR ARC 1 MAX DPO
BKR ARC 2 OP
BKR ARC 2 DPO
BKR ARC 2 MAX OP
BKR ARC 2 MAX DPO
ELEMENT:
BKR FAIL 1 RETRIPA
Breaker failure
BKR FAIL 1 RETRIPB
BKR FAIL 1 RETRIPC
BKR FAIL 1 RETRIP
BKR FAIL 1 T1 OP
BKR FAIL 1 T2 OP
BKR FAIL 1 T3 OP
BKR FAIL 1 TRIP OP
BKR FAIL 2
ELEMENT:
BRK RESTRIKE 1 OP
Breaker restrike
BRK RESTRIKE 1 OP A
BRK RESTRIKE 1 OP B
BRK RESTRIKE 1 OP C
BKR RESTRIKE 2
G60 GENERATOR PROTECTION SYSTEM – INSTRUCTION MANUAL
Operand description
Breaker 1 flashover element phase A has picked up
Breaker 1 flashover element phase B has picked up
Breaker 1 flashover element phase C has picked up
Breaker 1 flashover element has picked up
Breaker 1 flashover element phase A has operated
Breaker 1 flashover element phase B has operated
Breaker 1 flashover element phase C has operated
Breaker 1 flashover element has operated
Breaker 1 flashover element phase A has dropped out
Breaker 1 flashover element phase B has dropped out
Breaker 1 flashover element phase C has dropped out
Breaker 1 flashover element has dropped out
Same set of operands as shown for BKR 1 FLSHOVR
Breaker arcing current 1 has operated
Breaker arcing current 1 has dropped out
Breaker arcing current 1 max interrupting current has operated
Breaker arcing current 1 max interrupting current has dropped out
Breaker arcing current 2 has operated
Breaker arcing current 2 has dropped out
Breaker arcing current 2 max interrupting current has operated
Breaker arcing current 2 max interrupting current has dropped out
Breaker failure 1 re-trip phase A (only for 1-pole schemes)
Breaker failure 1 re-trip phase B (only for 1-pole schemes)
Breaker failure 1 re-trip phase C (only for 1-pole schemes)
Breaker failure 1 re-trip 3-phase
Breaker failure 1 timer 1 is operated
Breaker failure 1 timer 2 is operated
Breaker failure 1 timer 3 is operated
Breaker failure 1 trip is operated
Same set of operands as shown for BKR FAIL 1
Breaker restrike detected in any phase of the breaker control 1 element
Breaker restrike detected in phase A of the breaker control 1 element
Breaker restrike detected in phase B of the breaker control 1 element
Breaker restrike detected in phase C of the breaker control 1 element
Same set of operands as shown for BKR RESTRIKE 1
FLEXLOGIC
5
5-191