Download Print this page

Cornelius Viper 3 Installation Instructions Manual page 4

Hide thumbs Also See for Viper 3:

Advertisement

Viper 3 Flavor Plumbing Installation Instructions
NOTE: Tubing, hoses, and cabling may be routed from beneath or in back of the Viper FCB unit. It
may be necessary to make a penetration in the counter or wall to accommodate the desired
installation.
NOTE: If the syrup lines will be routed in an area that will see temperatures less than 55°F the lines
must be insulated.
½ Inch Beverage T ubing
3/8 Inch Beverage T ubing
¼ Inch Beverage T ubing
3/8 Inch T ygon T ubing
Water Filter
BIB Syrup
BIB Syrup
BIB Syrup
Publication Number: 629096928INS
FCB Unit
F
K
K
K
BIB Pump
C
Figure 1. Plumbing diagram Viper 3 Flavor
- 4 -
Connections
A
¼ Inch Female Flare Nut
B
Direct Connection to Syrup
C
Outlet on Syrup Pump
Outlet on Syrup Pump
Direct Connection to CO2
D
Inlet on Syrup Pump
Direct Connection to Syrup
Direct Connection to Syrup
E
K
Inlet on Syrup Pump
F
1/2 to3/8 Inch Fitting reducer
¼ Inch Cross Barb
G
H
CO2 Regulator - Primary
A
3/8 Inch Tee Barb
I
3/8 Inch Flare Nut and Barb (3/8)
J
3/8 to 1/4 Inch Fitting Reducer
K
1/4 Inch Tee barb
L
BIB Pump
C
D
E
D
E
G
E
BIB Pump
C
D
115 Psig
I
J
H
J
A
B
© 2008-2017, Cornelius Inc.

Advertisement

loading