Sfp Transceiver - IBM Storwize V7000 Maintenance Manual

Table of Contents

Advertisement

1. Carefully determine the failing physical port connection.
2. Remove the optical cable by pressing the release tab and pulling the cable out.
3. Remove the SFP transceiver. There are a number of different handling or
4. Push the new SFP transceiver into the aperture and ensure that it is securely
Figure 28. SFP transceiver
5. Reconnect the optical cable.
6. Confirm that the error is now fixed. Either mark the error as fixed or restart the
84
Storwize V7000: Troubleshooting, Recovery, and Maintenance Guide
Important: The Fibre Channel links in the enclosures are supported with both
longwave SFP transceivers and shortwave SFP transceivers. A longwave SFP
transceiver has some blue components that are visible even when the SFP
transceiver is plugged in. You must replace an SFP transceiver with the same
type of SFP transceiver that you are replacing. If the SFP transceiver to replace
is a longwave SFP transceiver, for example, you must replace with another
longwave SFP transceiver. Removing the wrong SFP transceiver might result in
loss of data access.
Be careful to exert pressure only on the connector and do not pull on the
optical cables.
locking mechanisms that are used on the SFP transceivers. Some SFP
transceivers might have a plastic tag. If so, pull the tag to remove the SFP
transceiver.
Important: Always check that the SFP transceiver that you replace matches the
SFP transceiver that you remove.
pushed home. The SFP transceiver usually locks into place without having to
swing the release handle until it locks flush with the SFP transceiver. Figure 28
illustrates an SFP transceiver and its release handle.
node depending on the failure indication that you originally noted.

Advertisement

Table of Contents
loading

Table of Contents