Step 2 — Unpackaging and Setup Continued
The spool holder has been removed from the machine and you will need to reinstall it. Locate the
spool holder and insert the 3 nylon lock nuts as shown in the second image.
Finally, position the spool holder on the top of the machine as shown in the third image. Use the (3)
6-32 x 1" machine screws to secure the spool holder to the top plate.