Track Frame - Kubota U20-3 Workshop Manual

Table of Contents

Advertisement

U20-3, U25-3 WSM

[3] Track frame

Blade (right)
While
pressing tightly
enough, lock the nut.
Then make sure the extension
blade lock pin can be smoothly
pulled and pushed.
Bolt
Not
Blade, assembly (center)
Blade (left)
Dwg. No.
Part No.
Part name
010
RB411-2121-3
Frame (track, center)
020
RB411-2122-2
Frame (track, left)
020
RB411-2122-4
Frame (track, left)
030
RB-411-2123-2 Frame (track, right)
030
RB411-2123-4
Frame (track, right)
040
RB-411-2115-0 Cover (moter)
050
RB411-2126-0
Cover (hose)
060
01135-61020
Bolt
070
RB411-2127-0
Plain washer
080
01138-61020
Bolt
090
04015-60100
???
100
RB401-2122-0
Pin
110
01133-61020
Bolt
120
RB411-2125-0
Bolt (stopper)
130
04512-60200
Spring washer
140
06331-35012
Plug
150
RB411-2181-2
Plate (slide)
160
01133-61220
Bolt
170
04013-60120
Plain washer
180
RB411-2182-0
Guide (crawler)
190
01133-61020
Bolt
Pin (30-135)
Iron Crawler
Q'ty
Interchangeability
A
1
Weight about 152 kg
1
~50185
1
Weight about 103 kg
50186~
1
~50185
1
50186~
2
2
10
M10×20L×1.25p 7T 48.1~55.9N·m(4.9~5.7kgf·m)
1
4
M10×20L×1.25p 7T 48.1~55.9N·m(4.9~5.7kgf·m)
4
φ30×62L
2
2
M10×20L×1.25p 7T 48.1~55.9N·m(4.9~5.7kgf·m)
4
Tipφ24 M32 fine-threaded 7T Tightning torgue:294.2~343.2N·m(30~35kgf·m)
4
8
Rubber crawler
4
Iron crawler
8
Iron crawler M10×20L×1.25p 7T 48.1~55.9N·m(4.9~5.7kgf·m)
8
Iron crawler
4
Iron crawler
12
Iron crawler M10×20L×1.25p 7T 48.1~55.9N·m(4.9~5.7kgf·m)
II-S-54
Machine body (Service section)
Bolt (stopper) 4 pcs.
Spring washer 4 pcs. Discontinued as from the 7th unit in August production
Frame (track, center): discontinued as from Hirakata production lot
Frame (Frack, right)
Frame (Frack, center)
Apply grease all over the
hatched inner surfaces.
(Do the same for the right side.)
Apply grease all over the
hatched inner surfaces.
(Do the same to the frame (track, right)).
Frame (track, left)
Preparatory steps
reasing the track frame stretcher
1. Press down the track stretch lever to get
the track width to maximum (1500 mm).
2. Remove mud off the stretcher, and apply
grease evenly all around the square pipe.
(4 locations at front and back)
3. Do the track stretching several times
between maximum (1500 mm) and
minimum (1300 mm) in order to get the
stretcher well greased.
Grease here.
Remarks
Grease here.

Advertisement

Table of Contents
loading

This manual is also suitable for:

U25-3

Table of Contents