Acceleration Lever; Acceleration Lever Assembly View (Lever Side); Acceleration / Ever Assembly View (Engine Side) - Kubota U20-3 Workshop Manual

Table of Contents

Advertisement

U20-3, U25-3 WSM

[2] Acceleration lever

Acceleration lever assembly view (lever side)

Acceleration / ever assembly view (Engine side)

1) Assembling procedure
1. Idling control
1250±50rpm
2. Set the engine rpm to maximum.
Make sure the lever is exactly at the engine
maximum rpm position.
3. Lever stroke (idling to maximum rpm)
70±5mm
4. Parts list
No.
Part No.
1
RB411-3539
2
RB411-3515
3
04013-60060
4
05511-51612
5. Apply grease to the DU bushing and make
sure the rotary shaft turns smoothly.
6. Tightening torque of bolt (14)
48.1~55.9N·m (4.9~5.7kgf·m)
7. Parts list
No.
Part No.
RB411-3510
8
RB411-3511
08511-01625
9
41233-7155
10
RP411-3512
11
RB401-3517
12
RC101-3521
13
04512-60100
14
01173-61025
15
01175-61045
16
02116-60100
II-S-27
Machine body (Service section)
Part name
Q'ty
Remarks
Spring (acceleration) 1
Cable (acceleration)
1
Plain washer
2
Split pin
2
Part name
Q'ty
Remarks
Lever, assembly
1
(acceleration)
Lever
1
(acceleration)
Bushing
1
Lever grip
1
Compression
1
spring
Plate
1
Plate
1
Spring washer
1
Bolt
1
M10×1.25 7T
Bolt
2
M10×1.25 7T
Nut
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

U25-3

Table of Contents