Dozer Cable Route; Dozer Lever Assembly View - Kubota U20-3 Workshop Manual

Table of Contents

Advertisement

U20-3, U25-3 WSM
[3] Dozer lever

Dozer lever assembly view

No.
Cover (right, top) RB411-4476Δ
Move the lever full stroke to see if the lever does not
hit the cover (right, top).

Dozer cable route

Guide
1) Assembling Procedure
1. Adjust the levers neutral positions, referring
to the figure at left.
2. Do not bend the end of the cable outer casing.
* Ensure a straight section of at least
20mm.
3. Allowable cable bending radius
To be over 150R
4. Check items after setup
1. Make sure the valve spool works all
over the stroke.
2. Make sure the valve spool moves smoothly.
5. Parts list
No.
Part No.
1
56501-17531 Grip
2
RB411-6577
3
04013-60100 Plain washer
4
05525-61000 Snap pin
II-S-30
Machine body (Service section)
Part name
Q'ty
Remarks
1
Cable (dozer)
1
2
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

U25-3

Table of Contents