Pilot Schemes - GE F60 Instruction Manual

Feeder protection system
Hide thumbs Also See for F60:
Table of Contents

Advertisement

CHAPTER 5: SETTINGS

5.9.2 Pilot schemes

SETTINGS  CONTROL ELEMENTS  PILOT SCHEMES
 PILOT SCHEMES
5.9.2.1 Permissive over-reaching transfer trip (POTT3)
SETTINGS  CONTROL ELEMENTS  PILOT SCHEMES  POTT3 SCHEME
 POTT3 SCHEME
F60 FEEDER PROTECTION SYSTEM – INSTRUCTION MANUAL
Figure 5-184: Cold load pickup logic
 POTT3 SCHEME
 DCB3 SCHEME
POTT3 SCHEME
FUNCTION: Disabled
POTT3 SCHEME BLOCK:
Off
POTT3 PERMISSIVE
ECHO: Disabled
POTT3 RX PICKUP
DELAY: 0.000 s
TRANS BLOCK PICKUP
DELAY: 0.020 s
TRANS BLOCK RESET
DELAY: 0.090 s
ECHO DURATION:
0.100 s
ECHO LOCKOUT:
0.250 s
MONITORING ELEMENTS
See below
See page 5-335
Range: Disabled, Enabled
Range: FlexLogic operand
Range: Disabled, Enabled
Range: 0.000 to 65.535 s in steps of 0.001
Range: 0.000 to 65.535 s in steps of 0.001
Range: 0.000 to 65.535 s in steps of 0.001
Range: 0.000 to 65.535 s in steps of 0.001
Range: 0.000 to 65.535 s in steps of 0.001
5
5-333

Advertisement

Table of Contents
loading

Table of Contents