Step 6: Connect Devices To The Switch; Step 7: Check The Installation - NETGEAR MS510TX Hardware Installation Manual

8-port multi-gigabit smart managed pro switch with two 10g ports / with poe plus
Hide thumbs Also See for MS510TX:
Table of Contents

Advertisement

8-Port Multi-Gigabit Smart Managed Pro Switch with two 10G Ports
To install an SFP transceiver module:
1.
Insert the transceiver into the SFP+ port.
2.
Press firmly on the flange of the module to seat it securely into the connector.

Step 6: Connect Devices to the Switch

The following procedure describes how to connect devices to the switch's RJ-45 ports. The switch supports
Auto Uplink technology, which allows you to attach devices using either straight-through or crossover cables.
Use a Category 5 (Cat 5), Cat 5e, or Cat 6 cable that is terminated with an RJ-45 connector.
Note
Ethernet specifications limit the cable length between the switch and the attached
device to 328 feet (100 meters).
To connect devices to the switch's RJ-45 ports:
1.
Connect a PoE or non-PoE device to an RJ-45 network port on the switch front panel.
2.
Verify that all cables are installed correctly.

Step 7: Check the Installation

Before you apply power to the switch, perform the following steps.
To check the installation:
1.
Inspect the equipment thoroughly.
2.
Verify that all cables are installed correctly.
Installation
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ms510txpp

Table of Contents