Setting Up The Base Receiver - Topcon GR-5 Operator's Manual

Part number 7010-1004
Hide thumbs Also See for GR-5:
Table of Contents

Advertisement

Field System Setup
• • • • • •
This chapter describes the field setup of your new receiver, so it is ready for use as a Base, network, RTK Rover, or static data
collector.

Setting Up the Base Receiver

1. Install a heavy duty tripod (p/n: 22 050501 01)
over a known point. You do not need a universal
tribrach and tribrach adapter when working with
this tripod.
2. Attach the antenna to the modem antenna
connector.
3. Level the tripod and tighten the screws.
4. Attach any other accessories as needed, such as a
back up power supply.
5. Measure the height of the receiver from the
ground using the tape measure. See "Measuring
Antenna Height" on page 59.
6. View the LED display panel for the receiver's
current status. See also "Display Panel Operations"
on page 19.
Field System Setup
GR-5 Receiver
Heavy Duty Tripod
P/N: 7010 1004
57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents