Radware Alteon Installation And Maintenance Manual page 28

Next-generation application delivery controller
Hide thumbs Also See for Alteon:
Table of Contents

Advertisement

Radware Alteon Installation and Maintenance Guide
Alteon Application Switch Platforms
Table 1: Alteon Application Switch 4408 Front Panel
Feature
Label/Description
SFP GbE ports for traffic or in-band management. The platform supports two SFP
GbE ports for traffic or in-band management.
LEDs:
ACT—flashing indicates activity.
LINK—green indicates 1000 Mbit/s.
Status LEDs:
PWR OK—green indicatesoperation. With Alteon Application Switch 4408
carrying a dual power supply,
SYS OK—green indicates nominal operation. Red indicates that the device is
booting. Red or alternating red and green indicates a warning. Examples or
such a warning is when the temperature is high, but still in the allowed
range.
Figure 2: Alteon Application Switch 4408 Back Panel (Single Power Supply Model)
Figure 3: Alteon Application Switch 4408 (with Dual Power Supply) Back Panel
Feature
Ground screws
Power supply socket(s)
Notes
>>
If the power is disconnected and reconnected (for example, after the power cord is
removed and replaced, or after a power failure), the platform returns to its previous
state. For example, if the platform was running, and then you disconnect the power
cord, when you reconnect the power cord, the platform automatically switches on.
Likewise, if the platform is not running, if you disconnect the power cord and reconnect
it, the platform stays powered off until you press the power button.
>>
For additional technical information, see
28
Table 2: Alteon Application Switch 4408 Back Panel
Description
Screws to ground the platform chassis to the rack. 1U units have one
ground screw. Typically, 2U units have two ground screws.
The socket to which the power cable is connected.
Appendix A - Specifications, page
Document ID: RDWR-ALOS-V2815_IG0203
77.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents