Maintenance Guide; Display Panel - AEG AS-IC01-4000 Installation Instructions Manual

Three-phase grid-tied solar inverter as-ic01 series and as-ic01-2 series (4 kw to 10 kw)
Table of Contents

Advertisement

24
Maintenance contents
Check the electrical
connection
Check the security
features

4.4.2 Maintenance guide

Here below the inverter cleaning procedure is briefly described:
1.
2.
3.
4. Repeat Section 4.1 operating content.
5.

5. Display panel

This section describes the panel display and provides instructions for display operation, including the LED indicators and
the LCD display.
PD201709 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (4-10 kW) V.1-17 EN
Check the cable connection and inverter terminals, make
sure they are connected reliably and that are not loose.
Check that the cables and terminals have no damage and
that the insulation is still reliable.
Check the off-on feature of inverter: use monitoring software
or LCD and keyboard on the inverter (if your model features
the latter two), turn "off" and "on", to confirm that the off-on
functionality is working correctly. At the same time, make
sure that the monitoring software can regularly
communicate with the inverter. Check the warning label
on/around the inverter, and replace it if necessary.
Disconnect the input and output switches.
Wait ten minutes.
Use a soft brush or a vacuum cleaner to clean the surface and the inlet and outlet of the inverter.
Restart the inverter.
Maintenance methods
Table 14: Maintenance actions
Maintenance cycle
Every six months
Every six months