Setting Up A Smartvdi-110 Server - ClearCube SmartVDI-110 Quick Start Manual

Table of Contents

Advertisement

Setting up a SmartVDI-110 Server

Cabling
Power option
ClearCube Technology, Inc.
This section shows how to connect cables. Numbers in parentheses correspond to labels shown in
"SmartVDI-110 front
panel" and in
Step
1
Install the included mounting rails to the server chassis and then install the chassis
in a rack.
2
Connect one or more Ethernet cables to the LAN ports (13) and (14) on the rear of
the chassis and connect the other end of the cable(s) to a network router or switch.
3
Connect one or more Ethernet cables to the Dedicated IPMI port (10) on the rear
of the chassis and connect the other end of the cable to a network router or switch.
4
From the rear of the chassis, connect the included power cables to the power
connectors (8 and 9) on the rear of the server, and connect the power cable to a
power outlet.
5
From the front of the chassis, press the power button (7) to power on the server.
Press the power button (7) on the front of the chassis to power on and power off a workstation.
Standby power is present when a workstation is powered off.
3700 W Parmer Lane
"SmartVDI-110 rear ports and
Action
Page 7 of 10
Austin, TX 78727
connectors" to ease identification.
P/N G0200181 Rev A, 1.0.12.14.2015
(512) 652-3500
www.clearcube.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SmartVDI-110 and is the answer not in the manual?

Questions and answers

Table of Contents