Install A Hot-Swap Fan - Lenovo ThinkSystem SR850 Maintenance Manual

Hide thumbs Also See for ThinkSystem SR850:
Table of Contents

Advertisement

Figure 51. Hot-swap fan removal
Attention: When replacing a fan with power on, complete the replacement within 30 seconds to
ensure proper operation.
Step 2.
Lift the fan out from the fan cage.
If you are instructed to return the component or optional device, follow all packaging instructions, and use
any packaging materials for shipping that are supplied to you.

Install a hot-swap fan

Use this procedure to install a hot-swap fan.
S017
CAUTION:
Hazardous moving fan blades nearby.
S033
CAUTION:
Hazardous energy present. Voltages with hazardous energy might cause heating when shorted with
metal, which might result in spattered metal, burns, or both.
The server comes with six speed-controlled hot-swap cooling fans. Before installing a hot-swap fan:
.
Chapter 3
Hardware replacement procedures
65

Advertisement

Table of Contents
loading

Table of Contents