3.
Installing the APG001Z
Install the
Turn off the input power of VF-PS1 and wait for at least 15 minutes and then check
that the CHARGE lamp on VF-PS1 is no longer lit.
Mandatory
(1) Turn off input power of VF-PS1 and wait for at least 15 minutes and then check
(2) Securing the option to the inverter
a) Insert a flat-blade screwdriver in each of the two holes at the upper part of the
b) Install the option in the inverter by fitting the tabs on the lower side the option into
c) Make sure the option is securely attached to the inverter. Then check whether the
d) Insert the tabs at the lower part of the front cover into the slots at the lower part of
e) Stuck the enclosed "LED name label" in the option LED display part of a front
b)
LED name label
COM
ERR
®
APOGEE
FLN
option to
that the CHARGE lamp on VF-PS1 is no longer lit.
front panel, release the panel mounting tab by pushing the screwdriver down and
remove the front panel cover.
the slots at the lower part of the inverter front panel.
plastic bosses on the inverter case have fitted in the holes at the upper and lower
parts of the option.
the inverter to attach the front cover to the inverter.
cover.
a)
c)
e)
VF-PS1
as follows.
Remove a standard equipped option
case, in case of below type of inverter.
VF-PS1 200V 55KW –90KW
400V 90 KW –630KW
- 8 -
E6581541②
d)
Need help?
Do you have a question about the APG001Z and is the answer not in the manual?
Questions and answers