  • Page 1 ES/EM/SBP + Lynx-U Battery Connection Ver. 1.0 Updated on May 7th, 2021 www.goodwe.com...
  • Page 2 This is an instruction for quick installation of ES, EM, SBP series energy storage inverters and GOODWE Lynx-U battery. For details of the connection or commissioning, please go to user manual of the inverter and the battery if you cannot fi nd it in this instruction. ES, EM, SBP have a similar connection and commissioning process. Herein we take ES inverter and GOODWE Lynx-U battery as an example for connection and commissioning. Precaution Remove the package and hold the battery handle to take the battery out. For more detailed information, please refer to Lynx-U battery User Manual. Make sure battery and inverter are not damaged. Inverter and battery breaker is turned off before making any further move.
  • Page 3: Step 1: Power Cable Wiring

    Step 1: Power Cable Wiring A. (a). Crimp the power cable. (b). Put the rubber sealing ring. (c). Secure the back shell. Note: Please use the power connector in accessory bag of Lynx-U battery. Please follow the instruction in the User Manual of battery for more detailed information. B. Put battery power cable through battery cover plate and press cable into the right port. Make sure the cable connected tightly by confi rming the Click sound. Power cable dimension: 20~25mm2 Note: Please follow inverter’ s requirement to select power cable if there is confl ict on ES or Battery manual.
  • Page 4 C. Make battery terminals and connect battery terminals to inverter. Note: Please use the battery connectors in the components box of solar inverter. Please follow the instruction in the User Manual of inverter for more detailed information. Step 2: Communication Cable Wiring A. Remove the waterproof module. B. Route the cable and RJ45 Registered Jack through seal ring the waterproof module. Note: Two COM port are same. You can connect any one to inverter or to next battery.
  • Page 5 C. Secure the back cover. Note: For ES, EM, SBP, the BMS communication cable and RJ45 connector already have been installed on the inverter. No longer need to crimp the RJ45 Registered Jack any more. D. Connect the communication cable to the battery. Secure the cover. Last one COM port need to install terminal resistance.
  • Page 6 Pin Function of BMS Communication Connector on Battery Side RJ45 Registered Jack CAN COM Port Defi nition CAN_H CAN_L 1,2,3,6,7,8 Note: please use professional tools to do build up communication cable if you want to extend the cable. Step 3: Install the Wire Harness Fix Bar of Lynx-U Battery A. Put the wire harness on the corresponding slot.
  • Page 7 Step 4: Install the plastic cover A. Put the wire harness on the corresponding slot. B. Install the bar using M5 screws. Step 5: Commissioning A. Download and install PV Master on your smart phone and connect inverter via wireless. Download Connect the smartphone and Install with the inverter. PV Master Wi-Fi SSID: Solar-WiFi** Passwaord: 12345678 B. Select the “Lynx-U” battery model on PV Master → Basic Setting. LX U5.4-L*1 Select “LX U5.4-L” on PV Master. LX U5.4-L*2 LX U5.4-L*3 LX U5.4-L*4...
  • Page 8 Battery Paralleling For details, please follow GOODWE instructions. →1 – 6 Lynx-U Batteries Paralleling To inverter ..COM PORT COM PORT COM PORT COM PORT .... Terminal Resistance ..Battery 1 Battery 2 Battery 6 Protective Cover Note: 1. Power cables and communication cables need to be installed wire harness fix bar.
  • Page 9 JIANGSU GOODWE POWER SUPPLY TECHNOLOGY CO.,LTD No. 90 Zijin Rd., New District, Suzhou, 215011, China www.goodwe.com service@goodwe.com...

This manual is also suitable for:

Em seriesSbp seriesLynx-u