Condensate Trap Assembly - Cleaning Procedure; Further Installation Details - IBC SL 14-115 G3 Installation And Operating Instructions Manual

Modulating gas boilers
Table of Contents

Advertisement

NOTE
It is the responsibility of
the installing and/or service
Contractor to advise and instruct
the end User in how to perform
the Trap cleaning procedure,
and to advise that the Trap
be checked at least every two
months and cleaned as required.
1-18
SL 14-115 G3, SL 20-160 G3, SL 30-199 G3 MODULATING GAS BOILERS
SL 14-115 G3, SL 20-160 G3, SL 30-199 G3 MODULATING GAS BOILERS

1.5.3 Condensate Trap Assembly - cleaning procedure

1.
Turn off the power to the boiler and allow it to cool down.
2.
Remove the trap from the boiler (reverse the installation procedure above).
3.
Remove the Trap Cleanout Assembly (H), from the Trap Body and clean and flush the
debris out.
4.
Re-assemble trap components, re-fill trap, and replace on boiler as described in the
installation instructions above.

1.5.4 Further installation details

Condensate drain must be piped to within 1" of a drain or be connected to a
condensate pump.
Drainage line must slope down to the drain at a pitch of 1/4" per foot so condensate
runs towards the drain.
Condensate traps should be checked every 2 months, and cleaned and refilled as
necessary.