1. Package Contents Thank you for purchasing PLANET Industrial L2+ Managed Ethernet Switch. “Industrial Managed Switch” is used as an alternative name in this Quick Installation Guide. Open the box of the Industrial Managed Switch and carefully unpack it. The box should contain the following items:...
2. Making Waterproof RJ45 Cable (IGS-5227-6T) Please read the following instructions and follow the procedures in the order being presented: Step 1: Take a waterproof RJ45 jack out from the Industrial Managed Switch box and get hold of one RJ45 cable.
Page 5
Step 4: Put the RJ45 connector in place with cable crimper. The standard RJ45 receptacle/connector There are 8 wires on a standard UTP/STP cable and each wire is color-coded. The following shows the pin allocation and colors of straight-through cable connection: Straight Cable SIDE 1 SIDE 2...
Page 6
RJ45 connector is obtained from PLANET, make sure its dimensions are the same. Note 3. Never use any waterproof RJ45 connector that is not purchased from PLANET or doesn’t have the same dimensions of the IGS- 5227-6T; it will damage the device permanently.
3. Connecting Waterproof Cable to the IGS-5227-6T Follow all the connecting waterproof cable steps as shown in the example. Note Step 1: Turn counterclockwise to remove the waterproof screw nuts of a RJ45 port and power input. Step 2: Insert the waterproof RJ45 connector into the port of the Industrial...
Page 8
Step 3: Turn clockwise to tighten the screw nut of the waterproof RJ45 connector. Step 4: Insert the waterproof M12 power connector into the port of the power input.
Page 9
Step 5: Turn clockwise to tighten the screw nut of the waterproof M12 power connector. Make sure to tightly close all interfaces to have waterproof effect. Before connecting the DC power cord, please check whether your local DC power source is stable. Note...
4. M12 A-coded Connector Pin Assignment The IGS-5227-6MT front panel provides six 10/100/1000BASE-T Ethernet ports in the form of M12 8-pin A-coded female connector. These ports are designed for Ethernet equipment connection through Cat5/5e UTP cables. The M12 8-pin A-coded input interface pinout is shown below: 8-pin M12 A-coded Female 10/100/1000T Connector Pin Assignment...
6. M12 X-coded Connector Pin Assignment The IGS-5227-6MT-X front panel provides six 10/100/1000BASE-T Ethernet ports in the form of M12 8-pin X-coded female connector. These ports are designed for Ethernet equipment connection through Cat5/5e UTP cables. The M12 8-pin X-coded input interface pinout is shown below: 8-pin M12 X-coded Female 10/100/1000T Connector Pin Assignment...
8. Connecting M12 Cable to the IGS-5227-6MT/ IGS-5227-6MT-X Follow all the connecting M12 cable to the IGS-5227-6MT/IGS- 5227-6MT-X steps as shown in the example. Note Step 1: Turn counterclockwise to remove the waterproof screw nuts of an M12 connector and power input. Step 2: Insert the M12 UTP male connector into the M12 female Gigabit Ethernet port of the Industrial Managed Switch.
Page 15
Step 4: Insert the M12 power female connector into the M12 male port of the power input. Step 5: Turn clockwise to tighten the screw nut of the M12 power connector. Before connecting the DC power cord, please check whether your local DC power source is stable.
9. M12 DC Power Cable Pin Assignment The front panel of the Industrial Managed Switch provides one M12 DC power 5-pin male connector for DC power input. Please use the power cable with the M12 DC power 5-pin female connector from the Industrial Managed Switch package for DC power input.
10. Requirements Workstations running Windows XP/2003/Vista/7/8/10/2008, MAC OS X or later, Linux, UNIX, or other platforms are compatible with TCP/IP Protocols. Workstations are installed with Ethernet NIC (Network Interface Card) Ethernet Port Connection z Network cables -- Use standard network (UTP) cables with RJ45 connectors. z The above PC is installed with Web browser and JAVA runtime environment plug- It is recommended to use Internet Explore 8.0 or above to access the Industrial Managed Switch.
11. Starting Web Management The following shows how to start up the Web Management of the Industrial Managed Switch. Note the Industrial Managed Switch is configured through an Ethernet connection. Please make sure the manager PC must be set on the same IP subnet address.
Page 19
Logging in to the Industrial Managed Switch 1. Use Internet Explorer 8.0 or above Web browser and enter IP address http://192.168.0.100 (default IP address) to access the Web interface. 2. When the following dialog box appears, please enter the default user name and password “admin”.
Page 20
The Switch Menu on the left of the Web page lets you access all the commands and statistics the Industrial Managed Switch provides. Figure 11-4: Switch Menu If you are not familiar with Switch functions or the related param- eter, press “Help icon” anytime on the Web page to get the help description.
12. Saving Configuration via Web In the Industrial Managed Switch, the running configuration file is stored in the RAM. In the current version, the running configuration sequence of running- config can be saved from the RAM to FLASH by executing save startup config command, so that the running configuration sequence becomes the startup configuration file, which is called configuration save.
13. Recovering Back to Default Configuration IP address has been changed or admin password has been forgotten – Follow all the recovering back to default configuration steps as shown in the example. Note 1. Power off the Industrial Managed Switch and remove all the existing connec- tions.
Thank you for purchasing PLANET products. You can browse our online FAQ resource and User’s Manual on PLANET Web site first to check if it could solve your issue. If you need more support information, please contact PLANET switch support team.