Norac UC5 Topcon X30 Installation Manual

Norac UC5 Topcon X30 Installation Manual

Spray height control system, display kit
Hide thumbs Also See for UC5 Topcon X30:

Advertisement

Topcon X30
Display Kit
Installation Manual
54VT-TC-X30

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UC5 Topcon X30 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Norac UC5 Topcon X30

  • Page 1 Topcon X30 Display Kit Installation Manual 54VT-TC-X30...
  • Page 2 Reorder P/N: 54VT-TC-X30-INST Rev E (Topcon X30 Display Kit) NOTICE: NORAC Systems International Inc. reserves the right to improve products and their specifications without notice and without the requirement to update products sold previously. Every effort has been made to ensure the accuracy of the information...
  • Page 3: Table Of Contents

    Contents INTRODUCTION ...................... 2     List of Parts ..................................2     TECHNICAL SPECIFICATIONS ................3     INSTALLATION ......................4     CANbus Interface Installation ............................4     Switch Box Installation ..............................5     CABLE DRAWINGS ....................6    ...
  • Page 4: Introduction

    1 Introduction The Topcon X30 Display Kit Manual is intended to be used in conjunction with the UC5 Spray Height Control Installation Manual. This manual provides instructions to interface the UC5 Control Module to the Topcon X30 Display. For installation of the rest of the UC5 Spray Height Control System please refer to the sprayer specific manual provided with the kit.
  • Page 5: Technical Specifications

    2 Technical Specifications CAN ICES-3(A)/NMB-3(A) This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules.
  • Page 6: Installation

    3 Installation CANbus Interface Installation 1. Securely mount the control module (E01) in the cab of the sprayer. 2. Tee the CANbus interface cable (C40) in to the CAN 1 connection on the Topcon wiring harness. 3. Connect the Deutsch plug on cable C40 to the end of the control module with only one Deutsch connector.
  • Page 7: Switch Box Installation

    Switch Box Installation 1. Disconnect cable C20 (Thru 2 connector) from the Input Module (E03). Remove the wedge from the face of the 12 pin Deutsch plug. 2. Insert the Roll CW pin from C26 into position 3 of the 12 pin plug on C20. Insert the Roll CCW pin from C26 into position 4 of the 12 pin plug on C20.
  • Page 8: Cable Drawings

    4 Cable Drawings ITEM C25: 44602-01 – Switch Remote Hand Control...
  • Page 9: Item C26: 43240-26 - Cable Uc5 Switch Box

    ITEM C26: 43240-26 – Cable UC5 Switch Box...
  • Page 10: Item C40: 43260-08 - Cable Uc5 Interface Canbus 4-Pin Deutsch

    ITEM C40: 43260-08 – Cable UC5 Interface CANbus 4-Pin Deutsch...
  • Page 11: Appendix A: Alternate Configuration

    5 Appendix A: Alternate Configuration If your sprayer has European style slant control, you will need to reconfigure the switch box as shown below. This is only required for sprayer types which are driving the slant output from the Input Module. Reconfigure the pins on cable C26 as follows: Normal Configuration European Style Slant Configuration Function...
  • Page 12 Canada NORAC Systems International Inc. Phone: (+1) 306 664 6711 Toll Free: 1 800 667 3921 Shipping Address: 3702 Kinnear Place Saskatoon, SK S7P 0A6 United States NORAC, Inc. Phone: (+1) 952 224 4142 Toll Free: 1 866 306 6722...

This manual is also suitable for:

Uc5

Table of Contents