requested power
enough capacity to fulfil the reserve even if all the gen-sets will run.
N
OTE
Fulfiled reserve means the actual reserve is above the requested reserve for start.
N
OTE
This output do not indicate the requested reserve has been already fulfiled. It
only indicates whether the system is able to fulfil it or not.
Binary output: Ready for Load
Related FW
3.2
Description
This output is closed while the gen-set is running, it's voltage and frequency are in
limits and the GCB is able to be closed or is already closed.
Binary output: Gen-set active
Related FW
3.2
Description
The output closes at the beginning of the prestart phase and opens after the gen-
set has been fully stopped. If the gen-set fails to start the output opens after the
last cranking attempt.
N
OTE
The output also closes if the engine begins to rotate spontaneously.
Binary output: Operational
Related FW
3.2
Description
The output is closed when the gen-set is ready for operation or is currently in
operation.
Binary output: Not ready
Related FW
3.2
Description
The output is closed while the gen-set is not in operation, however it is not ready
to be put into operation. The output is closed while:
Inteli NT GeCon-MARINE MINT, SW Version 3.2, ©ComAp – July 2015
IGS-NT-GeCon-MARINE-MINT-3.2.PDF
reserve. If this output is not closed it means the system has not
:
:
:
the genset is not running and
the controller is in OFF mode or
there is an alarm blocking start of the gen-set.
201

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IG-NT GC and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ig-nt-bbIg-ntc-bbIg-ntc gcIs-ntIs-ntc-bb

Table of Contents

Save PDF