Integration into a PROFIBUS network
7.5
Post-connection check
Are cables or the device undamaged (visual inspection)?
Do the cables comply with the requirements?
Do the cables have adequate strain relief?
Are all cable glands installed, firmly tightened and correctly sealed?
Does the supply voltage match the specifications on the transmitter nameplate?
Is the terminal assignment correct (® ä 25)?
If required: Is the protective earth connected correctly (® ä 25)?
If supply voltage is present: Is the device ready for operation and do values appear on the display
module?
Are all housing covers installed and firmly tightened?
Is the securing clamp tightened correctly?
8
Integration into a PROFIBUS network
8.1
Overview of the device database files (GSD)
Manufacturer ID
Ident number
Profile version
GSD file
GSD file version
32
17 (0x11)
0x1558
3.02
Information and files under:
•
www.endress.com
•
www.profibus.org
Levelflex FMP56, FMP57
Endress+Hauser
Need help?
Do you have a question about the Levelflex FMP56 and is the answer not in the manual?
Questions and answers