Gauge Removal And Installation; Gauge Removal; Gauge Installation - Terex PT-50 Service Manual

Rubber track loader
Hide thumbs Also See for PT-50:
Table of Contents

Advertisement

Rubber Track Loader
5. Operator Enclosure Disassembly and Assembly
4. Install the light bar. Refer to Chapter 5. Light Bar
Installation procedure.
Gauge Removal and Installa-
tion
The tools required for gauge removal and installation
are listed in Table 5-3. Use manufacturer-
recommended tools whenever possible.
Table 5-3
Required Tools
Combination wrench

Gauge Removal

1. Lower the light bar. Refer to Chapter 5. Light Bar
Removal procedure.
Figure 5-13
2. Disconnect the connector from the gauge.
Figure 5-14
3. Remove the two nuts that secure the gauge to
the retaining bracket.
Figure 5-15
4. Pull the gauge out from the front of the dash
panel.

Gauge Installation

Figure 5-16
1. Insert the gauge from the front of the dash pan-
el.
Figure 5-17
2. Install the two nuts that secure the gauge to the
retaining bracket.
5-4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt-60

Table of Contents