Garmin GIA 63 Installation Manual page 83

Hide thumbs Also See for GIA 63:
Table of Contents

Advertisement

3.8.1
Category A Long Term Power Interrupt Annual Inspection
NOTE
In order to comply with this procedure GIA 63 main software version must be 5.30 or later,
GIA 63W main software version must be 5.21 or later, and GDU main software version
must be 7.10 or later.
1. Verify the air temperature around both GIA's is at least 70° Fahrenheit.
2. Apply power to both GIA's.
3. Leave both GIA's on for 10 minutes.
4. Remove power from both GIA's.
5. Wait 30 seconds.
6. Apply power to both GIA's.
7. Place the G1000 in Configuration mode by holding the ENT key on the GDU's while applying
power.
8. Using the FMS knob go to the GIA STATUS page (Figure 3-2) on the PFD.
9. Verify the GIA #1 BKUP CAPS light is green. If the BKUP CAPS light is red, replace GIA #1
with a unit of mod status indicated in Table 3-3.
10. Using the FMS knob select GIA2 in the 'SELECT GIA UNIT' field.
11. Verify the GIA #2 BKUP CAPS light is green. If the BKUP CAPS light is red, replace GIA #2,
with a unit of mod status indicated in Table 3-3.
190-00303-05
Rev. Y
Figure 3-2. GIA STATUS Page
GIA 63 Installation Manual
Page 3-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents