Establishing Connections - Siemens SINAMICS PM240-2 Hardware Installation Manual

Power module for sinamics g120
Hide thumbs Also See for SINAMICS PM240-2:
Table of Contents

Advertisement

Connecting-up
5.2 Connecting the line and motor cable at the inverter
5.2.4

Establishing connections

Procedure
Proceed as follows to establish the connections:
1. Ensure that the device is in a no-voltage condition and the DC link is discharged.
2. Establish the connections as described in the following sections.
This means that you have established the connections.
Connections for frame sizes FSA ... FSC
Connections for frame sizes FSD ... FSF
You must remove the covers from the con-
nections in order to connect the line supply,
braking resistor and motor to the inverter.
In addition, for frame sizes FSD and FSE,
release the two terminal screws on the
connections for the motor and braking re-
sistor, and remove the dummy plug.
For frame size FSF you must breakout the
openings from the connection cover for the
power connections. Use side cutters or a
fine saw blade.
54
The Power Modules are equipped with with-
drawable plug connectors that cannot be inad-
vertently interchanged.
To remove a plug connector, you must release it
by pressing on the red lever.
Release lever
FSD ... FSF: remove the top covers
Hardware Installation Manual, 01/2017, A5E33294624B AE
Power Module PM240-2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents