Connecting The Line And Motor Cable At The Inverter; Connection Overview - Siemens SINAMICS PM240-2 Hardware Installation Manual

Power module for sinamics g120
Hide thumbs Also See for SINAMICS PM240-2:
Table of Contents

Advertisement

5.2

Connecting the line and motor cable at the inverter

5.2.1

Connection overview

Note
Line reactor
A line reactor is not required for the Power Modules FSD ... FSF.
Line filter
The inverters are available with or without integrated line filter (Class A). For frame sizes
FSA ... FSC, 3 AC 400 V, there are external filters (Class B) for increased EMC
requirements.
Output reactor
An output reactor is not required for the Power Modules FSD ... FSF.
Figure 5-2
Figure 5-3
Power Module PM240-2
Hardware Installation Manual, 01/2017, A5E33294624B AE
Line filter (Page 113)
Block diagram of the inverter, FSA ... FSC
Block diagram for the inverter, FSD ... FSF
5.2 Connecting the line and motor cable at the inverter
Connecting-up
49

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents