Hardware Installation; Precautions - Motorola AP 7181 Installation Manual

Hide thumbs Also See for AP 7181:
Table of Contents

Advertisement

2
AP 7181 Access Point: Installation Guide

2 Hardware Installation

An AP 7181 access point installation includes mounting the access point, connecting the
access point to the network, and applying power. Installation procedures vary for different
environments.

2.1 Precautions

Before installing an AP 7181 model access point verify the following:
Become familiar with grounding requirements (see
Verify the environment has a continuous temperature range between -40° C to 55°
C.
AP 7181 devices must be installed by trained professionals familiar with RF planning and
regulatory limits defined by the regulatory bodies of the country where the devices are
being deployed. All common precautions for grounding and ESD (Electrostatic Discharge)
protection should be observed during deployment and installation. AP 7181 devices are
designed to be installed outdoors and must be installed such that no harmful interference
results from device operation.
CAUTION
!
WARNING!
Installations must be performed by professionals who are properly trained and
certified.
Avoid contact with overhead power lines.
All device wiring must comply with the National Electric code
(NEC) or regulations and procedures defined by the regulatory
bodies of the country or region where the devices are being
deployed. All local building and structure codes must be
observed.
Strictly observe the following Safety Precautions during the AP
7181 Installation Procedure.
Grounding
Requirements).

Advertisement

Table of Contents
loading

Table of Contents