Take precautions to avoid injury from falling tools and equipment. Crews should
wear hardhats in and around the installation work site.
Be aware of vehicular traffic in and around the installation work site.
Do not hold any component containing a radio such that the antenna is very close
to or touching any exposed parts of the body, especially the face or eyes, while
transmitting.
Do not operate a portable transmitter near unshielded blasting caps or in an
environment where explosives are present unless the transmitter is especially
certified for such use.

2.2 Deployment Guidelines

Observe the following recommended guidelines to help ensure a successful network
deployment:
Mounting height for network devices should not exceed 30 to 35 feet. Mounting
height should vary to accomodate the topography of the deployment area, foliage,
and other obstructions.
Devices can be deployed using either the
Mount Installation
Point-to-Point (PTP (Slave)) or Point-to-Multipoint (PMP (SM)) nodes providing
backhaul should be oriented to point away from AP 7181 antenna panels.
NOTE
Custom stand-off brackets should be used as required to provide adequate pole
separation in an an effort to minimize reflective received power.
LoS guidelines should be given special consideration whenever devices will not be
installed in a straight line, such as deploying devices on alterating sides of a
roadway.
Ensure that all Root nodes are deployed with line of site to the wireless backhaul
cluster points.
procedure.
For more detailed deployment considerations for backhaul, refer
to the Mesh AP 7181 System Planner.