Installing the Sense and Dispense™ requires the following steps:
Mounting the Probe Cell
Plumbing the Probe Cell
Installing ORP and pH probes
Wiring probes to Probe Cell communication box
Wiring the Probe Cell to the AquaRite Pro
Wiring the pH Dispense device to the AquaRite Pro
Configuring the AquaRite Pro
Validating Operation
Establishing Maintenance Schedule

Materials Needed for Installation

10mm drill bit
Flex tubing cutter
Flathead screwdriver and mallet to remove knock-out
230 V pH dispense output must be protected by a differential protection device that
protects against no more than 30ma leakage current.
Extra wire, wire strippers, and wire nuts could be helpful in some installations
Any items that would be required for wiring and installation per local code
All electrical connections must be done by a qualified electrician according to local electrical standard.
If the supply cord is damaged, it must be replacing by the manufacturer, its service agent or
similarly qualified persons in order to avoid a hazard.
Before carrying out any part of the installation, be sure to shut off input power to the AquaRite
Pro. Turn off the pool filter pump, water features and any other related equipment. Relieve
pressure from the pool filtration system.
Use Only Genuine Hayward Replacement Parts.
Warning as regards children/people with reduced physical capacity:
This appliance is not intended for use by persons (including children) with reduced physical,
sensory or mental capabilities, or lack of experience and knowledge, unless they have been
given supervision or instruction concerning use of the appliance by a person responsible for
their safety.
Mounting the Probe Cell
The Probe Cell can be mounted directly on the side of the AquaRite Pro or mounted up to 4,4 m
away (limited by length of Probe Cell cable). The key to successful Probe Cell installation is in
the plumbing. A pressure differential is required to allow clean, untreated water to pass through
the cell and across the probes. Consider this when looking for an ideal mounting location.