5-1. Things to Check Before Turning the Power ON

5-1. Things to Check Before Turning
the Power ON
After wiring, be sure to check these items before turning ON the power of the FP3 MEWNET-TR system.
Item
Unit
S Does the unit type match the design list?
S Are the unit mounting screws properly tightened?
Power supply
S Is the power supply for the master station different from the
S Is the voltage correctly supplied?
S Is the wire size correct?
Wiring
S Is the RS485 interface on the unit correctly connected?
S Are the expansion cables properly connected between units?
S Does the wiring of the terminal match?
S Is the wire size correct?
Setting of
Master
S Is the FP3 transmitter master unit located as a terminal of the
terminal
station
station
i
Slave
S Is operation mode selector No. 4 set to the ON position when
station
Setting of master
<CPU>
station
S Is the mode selector set to the PROG. mode?
S Is the backup battery connector firmly connected?
<FP3 transmitter master unit>
S Is operation mode selector No. 1 set to the OFF position?
S Is the I/O address set correctly using operation mode
Setting of slave
<FP I/O transmitter unit>
station
S Is operation mode selector No. 2 set to the ON position?
S Is the station number correctly set?
S Are any station numbers overlapping?
72
power supply for slave stations?
network layout?
a slave station (FP I/O transmitter unit) is located as a
terminal station?
selector Nos. 5 to 8?
Description
Page to see
page 7 to 10 and 29
page 35 to 42
page 43 to 47
page 44
page 53
See the "FP3/FP10S
HARDWARE
Technical Manual."
page 50 and 51
page 52, 58 and 59

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fp10s

Table of Contents