There are two nailing brackets on the
sides of the fireplace. Follow the
directions below to prepare the nailing
brackets. Once in place, nail or screw
the nailing brackets to the framing.
1/2" Facing
For installations using
1/2" facing (1/2" drywall
or other facing) fold the
larger tab out 90°.
7/8" to 1" Facing
For installations using 1"
facing (1/2" drywall with
3/8" tile, 7/8" tile, etc.)
fold the shorter tab out
90°.
TOP VIEW
Fireplace
1/8"
NOTE: When installed, there must be a minimum
1/8" gap between the face and facing.
TOP VIEW
Fireplace
1/8"
NOTE: When installed, there must be a minimum
1/8" gap between the face and facing.
Framing
Nailing Bracket
Drywall
Framing
Nailing Bracket
Drywall
Tile