Datcon DT9100 B Operating Instructions Manual page 13

Intrinsically safe digital clock
Hide thumbs Also See for DT9100 B:
Table of Contents

Advertisement

DT9100 B
Preparatory steps
Holes for mounting
20140130-V0
There are four through-holes, shown by arrows in the
following drawing, for the fastening of the housing. The
diameters of the holes are made for M3 screws.
1. Mark the places of the holes in accordance with the
drawing.
2. Make the holes for mounting ready.
3. Remove any burrs from the ready-made holes.
Please observe the safety rules throughout the operation.
13

Advertisement

Table of Contents
loading

Table of Contents