APRILIA SR MAX 125 ie Service Station Manual page 197

Table of Contents

Advertisement

SR MAX 125 ie
Injection
Check the power supply line of the injection load
remote control energising coil: After switching to
"ON", make sure there is battery voltage, for two
seconds, between the black/white cable and
black-violet cable of the remote control base. If
there is not, check the continuity of the black/white
cable between fuse block and the remote control
base and of the black/violet cable between pin 20
of the control unit and the remote control base.
NOTE
CONTINUITY TESTS MUST BE CARRIED OUT WITH THE
COMPONENTS DISCONNECTED. (REMOTE CONTROLS,
ELECTRONIC CONTROL UNIT, FUSES, ETC.).
INJEC - 197

Advertisement

Table of Contents
loading

Table of Contents