Mounting Brackets, Chassis Rails, And Grounding Cable Installation Positions - HP FlexFabric 5950 Series Installation Manual

Hide thumbs Also See for FlexFabric 5950 Series:
Table of Contents

Advertisement

Figure 7 2U slide rail and chassis rail
1
(1) Chassis rail
Mounting brackets, chassis rails, and grounding cable
installation positions
The switch has one mounting position near the network ports and one mounting position near the
power supplies for mounting brackets.
The HPE 5950 4-slot switch provides three grounding points: primary grounding point (with a
grounding sign), auxiliary grounding point 1, and auxiliary grounding point 2. The HPE 5950
32QSFP28 and HPE 5950 48SFP28 8QSFP28 switches provide two grounding points: primary
grounding point (with a grounding sign) and auxiliary grounding point. See
Figure
10.
Select installation positions for the mounting brackets, chassis rails, and grounding cable as
required.
Figure 8 Mounting brackets and grounding cable installation positions on the HPE 5950
32QSFP28
(1) Power supply-side mounting position
(3) Auxiliary grounding point
2
(2) Slide rail
1
(2) Primary grounding point
(4) Port-side mounting position
10
2
Figure 8, Figure
9, and
3
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents