Installation; Installation Site Requirements; Desktop Installation; Rack Mounting - Upvel UP-308FEW User Manual

Poe+ web smart fast ethernet switch
Table of Contents

Advertisement

Installation

Installation Site Requirements

Ensure that the location where you plan to install the switch meets the following
requirements:
• Air temperature and humidity should be within the specified ranges (see technical
specifications on pp. 52, 53)
• Vent holes in the switch housing should not be blocked. Make sure that there is enough
space around the switch for proper ventilation and heat dissipation. Leave at least 10 cm
(4 inches) of space at the front and rear of the switch.
• The outlet should be close enough for the power cord to reach. The length of the power
cord supplied is 150 cm (59 inches).

Desktop installation

Place the switch on a sturdy, level surface that can support at least 5 kg (11 pounds). For
better stability, stick four rubber feet to the bottom of the switch near the corners.

Rack mounting

Attach the brackets to the switch using the included screws and then mount the switch on the
19-inch rack using the screws provided with the rack.

Power connection

1. Connect one end of the power cord to the AC power connector on the rear panel of the
switch, and then connect the other end of the power cord to an AC power outlet.
2. Check whether the Power LED is ON. When it is steady ON, it indicates the power
connection works properly.
User Manual
UP-308FEW / UP-316FEW
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Up-316few

Table of Contents