Installation Site Requirements; Power Connection - Upvel UP-236FEF Quick Installation Manual

16-port poe+ fast ethernet switch wiht gigabit combo uplink port
Table of Contents

Advertisement

Available languages

Available languages

Installation

Installation Site Requirements

Ensure that the location where you plan to install the switch meets the
following requirements:
Air temperature and humidity should be within the specified ranges.
See technical specifications on page 7.
Vent holes in the switch housing should not be blocked. Make sure
that there is enough space around the switch for proper ventilation
and heat dissipation. Leave at least 10 cm (4 inches) of space at the
front and rear of the switch.
The outlet should be close enough for the power cord to reach. The
length of the power cord supplied is 150 cm (59 inches).
Desktop installation: place the switch on a sturdy, level surface
that can support at least 5 kg (11 lbs). For better stability, stick four
rubber feet to the bottom of the switch near the corners.
Rack mounting: attach the brackets to the switch using the
included screws and then mount the switch on the 19-inch rack using
the screws provided with the rack.

Power connection

1. Connect one end of the power cord to the AC power connector on
the rear panel of the switch, and then connect the other end of the
power cord to an AC power outlet.
2. Check whether the Power LED is ON. When it is steady ON, it
indicates the power connection works properly.
4
UP-236FEF
Quick Installation Guide

Advertisement

Table of Contents
loading

Table of Contents